Home / Sweden / Jönköping 2011 78
A visit to Jönköping on 16th June, 3 days before Arriva ended their operation there. And boy can you tell. Arriva have surrendered this contract 5 years early, claiming losses. No doubt the substantial financial penalties imposed by JLT over the last two years for poor operation have something to do with it.
The quality of the operation was indeed shocking (as you will see from the photos) even by Arriva standards. Destination displays seem to be an optional extra. Nice to see Arriva being professional to the end of a contract isn't it? I'm sure that the people of Jönköping (and JLT) are now very happy Keolis are their local operator.
|
||